Unposted Costs - Cost
This field will display the unposted actuals (cost) for the user. The values in this field are limited to those actuals meeting the following conditions:
- Only amounts from timesheets in the LOCKED or EXTRACTED status will be considered.
- Only time actuals yet to be posted will be considered.
- Only actuals charged to projects with Owning Orgs belonging to the selected Legal Entity (which could be a subset of a timesheet due to subcontractors charging to multiple Legal Entities on a single timesheet).
- Only actuals falling within the specified date range (using either Work Date or Post Date depending on the configuration setting in the Admin >> Setup >> Accounting >> Posting Options (Labor Posting) fields).
The Cost value is calculated as: Timesheet Hours * Effective Cost Rate (rounded to 2 decimal positions on a per cell basis).
Click Through Popup Report
The number in this field can be clicked on to display a popup report showing a version of the Person Time Details report (limited to details that support the displayed value).